200906
### Note For this month pre-registered Tidbank with Hjemmkontor since Tidbank schema now set to 50% full time. In an attempt to keep the met.no PC functioning as long as possible this minimises the need to boot the machine and connect to met.no internal servers.
01/07/2009: The total number of hours worked = 73,5. Days worked=21. Average hours per day = 73,5/21 = 3,5
In consequence, this month has been left as all hjemmkontor logged. The laptop was repaired by DELL service by the end of the month, hence hereafter will switch back to near real-time logging of time.
Dag | Beskrivelse | Tid Start | Timer/hrs | Tidbank Tid |
---|---|---|---|---|
01 | - | - | - | - |
02 | Administration | 10:00 | 2 | ### |
03 | Building kvalobs database on ubuntu machine, reported documentation update re pg_hba.conf. | 18:00 | 5 | ### |
04 | Set up of test data on ubuntu and documentation of build procedure. Completed ubuntu test environment with kvalobs user. | 12:00 | 4 | ### |
05 | Investigate changes in boost filesystem library. Update and test Qc2 code. | 12:00 | 3 | ### |
06 | - | - | - | - |
07 | - | - | - | - |
08 | Fixed boost file-system bug/regression. Trouble-shooted errors in kvalobs database and filled missing tables. | 18:00 | 3 | ### |
09 | Conducted test runs in ubuntu system. Identified best-station-file hardcoded bug. | 12:00 | 3 | ### |
10 | Teleconference and work on pg_hba configuration and kvalobs_metadata. Preparation of pc error report. | 12:00 | 4 | ### |
11 | Qc2 test database work. | 15:00 | 3 | ### |
12 | Qc2 algorithm work, methods for validating Qc1 checks. | 12:00 | 4 | ### |
13 | - | - | - | - |
14 | - | - | - | - |
15 | Rebuilt plotting routines in ubuntu. | 18:00 | 3 | ### |
16 | Research on implementation of Akima algorithms. | 18:00 | 2 | ### |
17 | Teleconference and documentation work. | 17:00 | 3 | ### |
18 | Development of R programs to generate documentation and test performance of interpolation algorithms. | 12:00 | 4 | ### |
19 | Added additional Qc2 routine to perform standard set of interpolations and provide results for comparative analysis. | 12:00 | 4 | ### |
20 | - | - | - | - |
21 | - | - | - | - |
22 | Miscellaneous Qc2 development. | 12:00 | 3 | ### |
23 | Preparation of ECSN abstract. Contact with DELL and trouble shoot laptop. | 10:00 | 2 | ### |
24 | Testing and documentation of algorithms. Teleconference on kvalobs db architecture. | 15:00 | 3 | ### |
25 | Investigated changes in proj and delaunay routines with respect to ubuntu | 12:00 | 5 | ### |
26 | Analysis and debugging of triangulation algorithm. Check installation of proj libraries on ubuntu. Tracing of segmentation faults with gdb. | 12:00 | 6 | ### |
27 | - | - | - | - |
28 | - | - | - | - |
29 | Documentation of different interpolation algorithms within the kvalobs wiki. Submitted abstract to ECSN. | 16:00 | 4 | ### |
30 | Repair of laptop with service engineer. Laptop testing. Monthly administration. | 09:00 | 3.5 | ### |