Show pageOld revisionsBacklinksODT exportBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. === 200906 === ### **Note** For this month pre-registered Tidbank with Hjemmkontor since Tidbank schema now set to 50% full time. In an attempt to keep the met.no PC functioning as long as possible this minimises the need to boot the machine and connect to met.no internal servers. 01/07/2009: The total number of hours worked = 73,5. Days worked=21. Average hours per day = 73,5/21 = **3,5** In consequence, this month has been left as all hjemmkontor logged. The laptop was repaired by DELL service by the end of the month, hence hereafter will switch back to near real-time logging of time. ^Dag ^Beskrivelse ^Tid Start ^Timer/hrs ^Tidbank Tid ^ |01 |- |- |- |- | |02 |Administration |10:00 |2 |### | |03 |Building kvalobs database on ubuntu machine, reported documentation update re pg_hba.conf. |18:00 |5 |### | |04 |Set up of test data on ubuntu and documentation of build procedure. Completed ubuntu test environment with kvalobs user. |12:00 |4 |### | |05 |Investigate changes in boost filesystem library. Update and test Qc2 code. |12:00 |3 |### | |06 |- |- |- |- | |07 |- |- |- |- | |08 |Fixed boost file-system bug/regression. Trouble-shooted errors in kvalobs database and filled missing tables. |18:00 |3 |### | |09 |Conducted test runs in ubuntu system. Identified best-station-file hardcoded bug. |12:00 |3 |### | |10 |Teleconference and work on pg_hba configuration and kvalobs_metadata. Preparation of pc error report. |12:00 |4 |### | |11 |Qc2 test database work. |15:00 |3 |### | |12 |Qc2 algorithm work, methods for validating Qc1 checks. |12:00 |4 |### | |13 |- |- |- |- | |14 |- |- |- |- | |15 |Rebuilt plotting routines in ubuntu. |18:00 |3 |### | |16 |Research on implementation of Akima algorithms. |18:00 |2 |### | |17 |Teleconference and documentation work. |17:00 |3 |### | |18 |Development of R programs to generate documentation and test performance of interpolation algorithms. |12:00 |4 |### | |19 |Added additional Qc2 routine to perform standard set of interpolations and provide results for comparative analysis. |12:00 |4 |### | |20 |- |- |- |- | |21 |- |- |- |- | |22 |Miscellaneous Qc2 development. |12:00 |3 |### | |23 |Preparation of ECSN abstract. Contact with DELL and trouble shoot laptop. |10:00 |2 |### | |24 |Testing and documentation of algorithms. Teleconference on kvalobs db architecture. |15:00 |3 |### | |25 |Investigated changes in proj and delaunay routines with respect to ubuntu |12:00 |5 |### | |26 |Analysis and debugging of triangulation algorithm. Check installation of proj libraries on ubuntu. Tracing of segmentation faults with gdb. |12:00 |6 |### | |27 |- |- |- |- | |28 |- |- |- |- | |29 |Documentation of different interpolation algorithms within the kvalobs wiki. Submitted abstract to ECSN. |16:00 |4 |### | |30 |Repair of laptop with service engineer. Laptop testing. Monthly administration. |09:00 |3.5 |### | kvalobs/kvoss/system/qc2/8hdk376snf09zj37dk82s92/200906.txt Last modified: 2022-05-31 09:29:32(external edit)