Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
ecoop-eurodess:start [2009-05-27 08:55:47] martin.price@metoffice.gov.uk |
ecoop-eurodess:start [2022-05-31 09:29:32] (current) |
||
---|---|---|---|
Line 33: | Line 33: | ||
[[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service) | [[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service) | ||
Martin Price (METO) - IMR | Martin Price (METO) - IMR | ||
+ | [[S9.2.9 - Task 9.2 coordination]] | ||
+ | Göran Broström (MET-NO) | ||
Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP. | Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP. |