ecoop-eurodess:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
ecoop-eurodess:start [2009-05-12 18:35:44]
goranb
ecoop-eurodess:start [2022-05-31 09:29:32] (current)
Line 16: Line 16:
  
 ==== Subtasks ==== ==== Subtasks ====
 +
 [[S9.2.1 - Marine security in the Northwest Shelf]] (fast track service) [[S9.2.1 - Marine security in the Northwest Shelf]] (fast track service)
  Göran Broström (MET-NO) - MET-NO, NERSC, UREADES  Göran Broström (MET-NO) - MET-NO, NERSC, UREADES
 [[S9.2.2 - Ecosystem health in the North Sea]] (fast track service) [[S9.2.2 - Ecosystem health in the North Sea]] (fast track service)
- Holt Martin (METO) - CEFAS, IMR, METO, NIVA, TECHWORKS+ Martin Price (METO) - CEFAS, IMR, METO, NIVA, TECHWORKS
 [[S9.2.3 - Marine security and ecosystem health in the Aegean Sea]] (slow track service) [[S9.2.3 - Marine security and ecosystem health in the Aegean Sea]] (slow track service)
  Nittis Kostas (HCMR) - HCMR  Nittis Kostas (HCMR) - HCMR
Line 31: Line 32:
  Coppini Giovanni (INGV) -  Coppini Giovanni (INGV) -
 [[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service) [[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service)
- Holt Martin (METO) - IMR + Martin Price (METO) - IMR 
 +[[S9.2.9 - Task 9.2 coordination]]  
 + Göran Broström (MET-NO)
  
 Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP. Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP.
 Demonstrations, with user involvement, are carried out during the TOP with the V1 systems (Mo 24-27). Assessment of the TOP demonstrations (reported in Task 9.2) leads to revision and development from V1 to the final V2 systems (Mo 24-33). Representative V2 systems will be applied to a new area as a relocatability demonstration near the end of the project (Mo 33-36). Verification of codes will be carried out routinely and tested in connection with the demonstrations. Coordination and exchange of ideas with similar applications (through meetings and reporting) will support the development. Demonstrations, with user involvement, are carried out during the TOP with the V1 systems (Mo 24-27). Assessment of the TOP demonstrations (reported in Task 9.2) leads to revision and development from V1 to the final V2 systems (Mo 24-33). Representative V2 systems will be applied to a new area as a relocatability demonstration near the end of the project (Mo 33-36). Verification of codes will be carried out routinely and tested in connection with the demonstrations. Coordination and exchange of ideas with similar applications (through meetings and reporting) will support the development.
  
-Placeholder for ecoop-eurodess wiki+
  • ecoop-eurodess/start.1242153344.txt.gz
  • Last modified: 2022-05-31 09:23:14
  • (external edit)