ecoop-eurodess:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
ecoop-eurodess:start [2009-05-27 08:55:47]
martin.price@metoffice.gov.uk
ecoop-eurodess:start [2022-05-31 09:29:32] (current)
Line 33: Line 33:
 [[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service) [[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service)
  Martin Price (METO) - IMR  Martin Price (METO) - IMR
 +[[S9.2.9 - Task 9.2 coordination]] 
 + Göran Broström (MET-NO)
  
 Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP. Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP.
  • ecoop-eurodess/start.1243414547.txt.gz
  • Last modified: 2022-05-31 09:23:14
  • (external edit)