Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
ecoop-eurodess:start [2009-05-07 13:36:13] goranb |
ecoop-eurodess:start [2009-10-12 11:08:23] goranb |
||
---|---|---|---|
Line 3: | Line 3: | ||
===== Introduction ===== | ===== Introduction ===== | ||
==== Overview ==== | ==== Overview ==== | ||
- | This webpage describes the demonstrations of the [[Decision Support Systems (DeSS)]] in ECOOP, as described by task 9.2. Below we outline the objectives and the different subtask. The subtasks has been divided into fast track services that will demonstrate the DeSS during the Target Operational Period (TOP) | + | This webpage describes the demonstrations of the [[http:// |
==== Objectives ==== | ==== Objectives ==== | ||
Line 16: | Line 16: | ||
==== Subtasks ==== | ==== Subtasks ==== | ||
+ | |||
[[S9.2.1 - Marine security in the Northwest Shelf]] (fast track service) | [[S9.2.1 - Marine security in the Northwest Shelf]] (fast track service) | ||
Göran Broström (MET-NO) - MET-NO, NERSC, UREADES | Göran Broström (MET-NO) - MET-NO, NERSC, UREADES | ||
[[S9.2.2 - Ecosystem health in the North Sea]] (fast track service) | [[S9.2.2 - Ecosystem health in the North Sea]] (fast track service) | ||
- | Holt Martin (METO) - CEFAS, IMR, METO, NIVA, TECHWORKS | + | Martin |
[[S9.2.3 - Marine security and ecosystem health in the Aegean Sea]] (slow track service) | [[S9.2.3 - Marine security and ecosystem health in the Aegean Sea]] (slow track service) | ||
Nittis Kostas (HCMR) - HCMR | Nittis Kostas (HCMR) - HCMR | ||
Line 31: | Line 32: | ||
Coppini Giovanni (INGV) - | Coppini Giovanni (INGV) - | ||
[[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service) | [[S9.2.8 - Environmental status support to North Sea fisheries assessment]] (slow track service) | ||
- | Holt Martin (METO) - IMR | + | Martin |
+ | [[S9.2.9 - Task 9.2 coordination]] | ||
+ | Göran Broström (MET-NO) | ||
Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP. | Each target application will be performed as a separate subtask, but following a common procedure. The existing systems are identified as version V0. These are developed (Mo 9-24), through adoption of standards from Task 9.1 and interfacing to EuroMISS, to V1 in time for the TOP. | ||
Demonstrations, | Demonstrations, | ||
- | Placeholder for ecoop-eurodess wiki | + |