Show pageOld revisionsBacklinksODT exportBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. === 201003 === ^Dag ^Beskrivelse ^Tid Start ^Timer/hrs ^Tidbank Tid ^ |01 |Sprint 02 Meeting (1.5hrs). Clean-up of Qc2 separate branch autoconf. Bi-monthly administration tasks. |10:30 |5 |20100301 1030-1530 | |02 |Regional interpolations. Teleconference kv2kl philosophy, virtual environment managment and teleconference experience enhancement. |16:30 |4 |20100301 1600-2000| |03 |Kvalobs database configuration. Test environement algorithm checks. |16:00 |3 |20100301 1600-1900| |04 |Update of kvDataFlag with Flag Group feedback. Testing and configuration of flagging. |12:00 |5 |20100301 1200-1700| |05 |Scrum. Environment variable work. Documentation and administration. |11:00 |3 |20100305 1100-1400 | |06 |- |- |- |- | |07 |- |- |- |- | |08 |Input on re-organisation. General code tidy up and documentation. |14:00 |3 |20100308 1400-1700 | |09 |Documentation work. Acceptance test file. |08:00 |4 |20100309 0800-1200 | |10 |Tested flag checking controls. Updated the tests to see if the data has been tested by HQC or not. |17:00 |3 |20100310 1700-2000 | |11 |Weekly scrum. Update kvoss distribution after puTools changes, sorted out pkg_config issues. |12:00 |3 |20100311 1200-1500 | |12 |Added cfailed setting as a configuration file option. Checks and test to ensure Qc2 only runs after corresponding Qc1 runs (redistribution algorithm and temperature interpolation). |12:00 |6 |20100312 1200-1800 | |13 |- |- |- |- | |14 |- |- |- |- | |15 |Identified and corrected bug in ProcessUnitT with -99.9 missing values in paramid 213 and 215. Exapnded the logic for handling flag tests. |18:00 |6 |20100315 1400-2000 | |16 |Teleconference. Refined the handling of Best Station lists. |16:00 |5 |20100316 1600-2000 | |17 |Investigated problems with database and test data. Performed test database maintenance. |17:00 |3 |20100317 1700-2000 | |18 |Finalised and conducted dry-runs of ALG004. Updated documentation. |08:00 |6 |20100318 0800-1400 | |19 |Finalised and conducted dry-runs of ALG001. Updated documentation. |16:00 |4 |20100316 1600-2000 | |20 |- |- |- |- | |21 |- |- |- |- | |22 |Kvalobs Sprint Meeting. Qc2 general tidy-up and bug fixes.|10:00 |4 |20100322 1000-1400 | |23 |Re-organisation teleconference. Postgresql backup discussion and strategy with TER. Administration. |14:00 |4 |20100323 1400-1800 | |24 |Qc2 Algorithm flag testing. Wrote and dry-run Qc2-FLG-E2E |18:00 |4 |20100324 1600-2000 | |25 |Qc2 Scrum Meeting. Work on Qc2-OPE tests. |11:00 |5 |20100325 1100-1600 | |26 |Improved Qc2 logging information. Dry-run acceptance tests and tweaked documentation.|08:00 |4 |20100326 0800-1200 | |27 |- |- |- |- | |28 |- |- |- |- | |29 |Completion of the acceptance test file. Updated distributions in the lone-branch and trunk, exported latest versions to the test machines. |16:00 |6 |20100329 0800-1400 | |30 |Doxygen configuration and update. Documentation of configuration file parameters. |18:00 |3 |20100330 1700-2000 | |31 |Work on Qc2 presentation and demo for April 7 meeting. |12:00 |4 |20100331 1200-1600 | kvalobs/kvoss/system/qc2/8hdk376snf09zj37dk82s92/201003.txt Last modified: 2022-05-31 09:29:32(external edit)