Line 9: | Line 9: | ||
|06 |- |- |- |- | | |06 |- |- |- |- | | ||
|07 |- |- |- |- | | |07 |- |- |- |- | | ||
- | |08 |Kvalobs Kick-Off Meeting. Set up testing for different interpolation methods wrt precipitation conditions. |15:00 |3 |- | | + | |08 |Kvalobs Kick-Off Meeting. Set up testing for different interpolation methods wrt precipitation conditions. |15:00 |3 |2010-02-08 1500-1800 |
- | |09 |Qc2 testing and documentation work. |10:00 |2 |- | | + | |09 |Qc2 testing and documentation work. |10:00 |2 |2010-02-09 1000-1200 |
- | |10 |Trouble-shooting kvalobs Qc1 environment, | + | |10 |Trouble-shooting kvalobs Qc1 environment, |
- | |11 |Short scrum (30 mins) and later TER teleconference. Analysis of requirements for debian package set up. Documentation of acceptance test file work. |14:00 |4 |- | | + | |11 |Short scrum (30 mins) and later teleconference. Analysis of requirements for debian package set up. Documentation of acceptance test file work. |14:00 |4 |2010-02-11 1400-1800 |
- | |12 |Flag documentation. Installation of Qt3/4 libraries on dev-vm116. Reconfigure algorithms to all run RANGE_CHECK in investigation of missing row generation. |16:00 |6 |- | | + | |12 |Flag documentation. Installation of Qt3/4 libraries on dev-vm116. Reconfigure algorithms to all run RANGE_CHECK in investigation of missing row generation. |16:00 |6 |2010-02-12 0800-1400 | |
|13 |- |- |- |- | | |13 |- |- |- |- | | ||
|14 |- |- |- |- | | |14 |- |- |- |- | | ||
|15 |AVSPASERING |- |- |- | | |15 |AVSPASERING |- |- |- | | ||
- | |16 |Teleconference: | + | |16 |kvalobs interpreter |
- | |17 |- |- |- |- | | + | |17 |Update and expansion of test environment. Trouble shoot missing lines in kvalobs database. |
- | |18 |- |- |- |- | | + | |18 |Work on Qc2 control flag configuration after input from the flag expert group. |
- | |19 |- |- |- |- | | + | |19 |Weekly scrum. More analysis of SeNorge data. |12:30 |3 |2010-02-19 1230-1530 | |
|20 |- |- |- |- | | |20 |- |- |- |- | | ||
|21 |- |- |- |- | | |21 |- |- |- |- | | ||
- | |22 |- |- |- |- | | + | |22 |AVSPASERING |
- | |23 |- |- |- |- | | + | |23 |Analysis of SeNorge summary data. Various administration. Teleconference. Triangulation interpolation method work; check of coordinate transformations. |
- | |24 |- |- |- |- | | + | |24 |Add best station options to Qc2 interpolation configuration, |
- | |25 |- |- |- |- | | + | |25 |Improvements to operational environment; |
- | |26 |- |- |- |- | | + | |26 |Separating Qc2 distribution from kvalobs tree. Work on reconfiguration of autoconf tools. |