Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
kvalobs:kvoss:system:qc2:8hdk376snf09zj37dk82s92:200906 [2009-06-26 00:24:01] paule |
kvalobs:kvoss:system:qc2:8hdk376snf09zj37dk82s92:200906 [2022-05-31 09:29:32] (current) |
||
---|---|---|---|
Line 5: | Line 5: | ||
the met.no PC functioning as long as possible this minimises the need | the met.no PC functioning as long as possible this minimises the need | ||
to boot the machine and connect to met.no internal servers. | to boot the machine and connect to met.no internal servers. | ||
+ | |||
+ | 01/07/2009: The total number of hours worked = 73,5. Days worked=21. Average hours per day = 73,5/21 = **3,5** | ||
+ | |||
+ | In consequence, | ||
+ | |||
^Dag ^Beskrivelse ^Tid Start ^Timer/hrs ^Tidbank Tid ^ | ^Dag ^Beskrivelse ^Tid Start ^Timer/hrs ^Tidbank Tid ^ | ||
Line 17: | Line 22: | ||
|09 |Conducted test runs in ubuntu system. Identified best-station-file hardcoded bug. |12:00 |3 |### | | |09 |Conducted test runs in ubuntu system. Identified best-station-file hardcoded bug. |12:00 |3 |### | | ||
|10 |Teleconference and work on pg_hba configuration and kvalobs_metadata. Preparation of pc error report. |12:00 |4 |### | | |10 |Teleconference and work on pg_hba configuration and kvalobs_metadata. Preparation of pc error report. |12:00 |4 |### | | ||
- | |11 |Qc2 test database work. |15:00 |3 |- | | + | |11 |Qc2 test database work. |15:00 |3 |### | |
- | |12 |Qc2 algorithm work, methods for validating Qc1 checks. |12:00 |4 |- | | + | |12 |Qc2 algorithm work, methods for validating Qc1 checks. |12:00 |4 |### | |
|13 |- |- |- |- | | |13 |- |- |- |- | | ||
|14 |- |- |- |- | | |14 |- |- |- |- | | ||
- | |15 |Rebuilt plotting routines in ubuntu. |18:00 |3 |- | | + | |15 |Rebuilt plotting routines in ubuntu. |18:00 |3 |### | |
- | |16 |Research on implementation of Akima algorithms. |18:00 |2 |- | | + | |16 |Research on implementation of Akima algorithms. |18:00 |2 |### | |
- | |17 |Teleconference and documentation work. |17:00 |3 |- | | + | |17 |Teleconference and documentation work. |17:00 |3 |### | |
- | |18 |Development of R programs to generate documentation and test performance of interpolation algorithms. |12:00 |4 |- | | + | |18 |Development of R programs to generate documentation and test performance of interpolation algorithms. |12:00 |4 |### | |
- | |19 |Added additional Qc2 routine to perform standard set of interpolations and provide results for comparative analysis. |12:00 |4 |- | | + | |19 |Added additional Qc2 routine to perform standard set of interpolations and provide results for comparative analysis. |12:00 |4 |### | |
|20 |- |- |- |- | | |20 |- |- |- |- | | ||
|21 |- |- |- |- | | |21 |- |- |- |- | | ||
- | |22 |Qc2 development. |12:00 |3 |- | | + | |22 |Miscellaneous |
- | |23 |Preparation of ECSN abstract. Contact with DELL and trouble shoot laptop. |10:00 |2 |- | | + | |23 |Preparation of ECSN abstract. Contact with DELL and trouble shoot laptop. |10:00 |2 |### | |
- | |24 |Testing and documentation of algorithms. Teleconference on kvalobs db architecture. |15:00 |3 |- | | + | |24 |Testing and documentation of algorithms. Teleconference on kvalobs db architecture. |15:00 |3 |### | |
- | |25 |Investigated changes in proj and delaunay routines with respect to ubuntu |12:00 |5 |- | | + | |25 |Investigated changes in proj and delaunay routines with respect to ubuntu |12:00 |5 |### | |
- | |26 |- |- |- |- | | + | |26 |Analysis and debugging of triangulation algorithm. Check installation of proj libraries on ubuntu. Tracing of segmentation faults with gdb. |
|27 |- |- |- |- | | |27 |- |- |- |- | | ||
|28 |- |- |- |- | | |28 |- |- |- |- | | ||
- | |29 |- |- |- |- | | + | |29 |Documentation of different interpolation algorithms within the kvalobs wiki. Submitted abstract to ECSN. |16:00 |4 |### | |
- | |30 |- |- |- |- | | + | |30 |Repair of laptop with service engineer. Laptop testing. Monthly administration. |
- | |31 |- |- |- |- | | + | |