Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
ecoop-river:start:s2.5.3 [2007-10-15 21:07:06] bruceh |
ecoop-river:start:s2.5.3 [2022-05-31 09:29:32] (current) |
||
---|---|---|---|
Line 11: | Line 11: | ||
[[start: | [[start: | ||
+ | |||
+ | ===== Documents and links ===== | ||
+ | |||
+ | * [[boos_dac|BOOS data assembly center]] | ||
+ | * [[noos_dac|NOOS data assembly center]] | ||
+ | * [[ibi_dac|IBI-ROOS data assembly center]] | ||
+ | * [[med_dac|MedGOOS data assembly center]] | ||
+ | * [[bsgoos_dac|Black Sea GOOS data assembly center]] | ||
+ | |||
+ | |||
+ | ===== Files ===== | ||
+ | |||
+ | |||
===== Activity description (Annex I 6.1)===== | ===== Activity description (Annex I 6.1)===== | ||
Line 27: | Line 40: | ||
* Identify a test provider able to provide NRT data early in the project period. Test the data acquisition and interfacing procedures (cf. [[start: | * Identify a test provider able to provide NRT data early in the project period. Test the data acquisition and interfacing procedures (cf. [[start: | ||
- | |||
- | |||
===== Deliverables ===== | ===== Deliverables ===== | ||
Line 34: | Line 45: | ||
^ No. ^ Title ^ Resp ^ MM ^ Nature ^ Diss ^ Due ^ | ^ No. ^ Title ^ Resp ^ MM ^ Nature ^ Diss ^ Due ^ | ||
- | | D2.5.3.1 | Description and assessment of the ECOOP river runoff data provision | met.no | 3 | R | + | | D2.5.3.1* | Interfacing river runoff data to the ECOOP Data Management System |
+ | | D2.5.3.2 | ||
+ | |||
+ | *This deliverable is misnumbered in the DoW. It really belongs to S2.5.2. However, it's easier to leave the numbering unchanged. See [[s2.5.2]] |