Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
ecoop-river:start:s2.5.2 [2007-10-15 20:47:01]
bruceh
ecoop-river:start:s2.5.2 [2009-01-09 10:15:29]
bruceh
Line 10: Line 10:
  
 [[start:s2.5.1:actions|⇒ Action list]] [[start:s2.5.1:actions|⇒ Action list]]
 +
 +===== Documents and links =====
 +
 +==== Reference ====
 +
 +  * {{start:20061130_-_nrt_datenformat_for_grdc_v3.0.pdf|GRDC proposed format for NRT discharge data}}
 +  * {{start:grdc-nrt-format-v2.doc.pdf|GRDC proposed format for NRT discharge data - earlier version}}
 +  * [[http://grdc.bafg.de/servlet/is/6678/|Link to the above documents at GRDC/GTN-R]]
 +
 +
 +
 +
 +==== Deliverable reports ====
 +
 +  * {{start:d2.2.4.2_data_interfaces_for_the_ecoop_dms_v0.61.doc|D2.2.4.2 Data interfaces for the EDMS, v0.61}}  Contains description of ODV data formatting for river discharge data.
 +
 +===== Files =====
 +
 +
 +==== Data files ====
 +
 +
 +==== Other files ====
 +
 +
 +==== Activity Reports ====
 +
 +  * {{start:activity_report_year1_s2.5.1.doc|S2.5.1 Year1 rev 27.01.2008}}
 +  * {{start:activity_report_year1_s2.5.2.doc|S2.5.2 Year1 rev 27.01.2008}}
 +  * {{start:activity_report_year1_s2.5.3.doc|S2.5.3 Year1 rev 27.01.2008}}
 +  * {{start:activity_report_year1_t2.5.doc|T2.5 Year1 rev 27.01.2008}}
 +
 +
 +
  
 ===== Activity description (Annex I 6.1) ===== ===== Activity description (Annex I 6.1) =====
  
-**Title**: Interfacing to ECOOP Data Management system+**S2.5.2**: Interfacing to ECOOP Data Management system
  
 **Objectives**: Define and test procedures for acquiring river runoff data from providers and making them available through the ECOOP data management systems. **Objectives**: Define and test procedures for acquiring river runoff data from providers and making them available through the ECOOP data management systems.
Line 31: Line 65:
  
   * initial tests of the data flow procedures on representative sources in each region.   * initial tests of the data flow procedures on representative sources in each region.
- 
  
  
Line 39: Line 72:
  
 ^ No.      ^ Title                                                               ^ Resp   ^ MM ^ Nature ^ Diss ^ Due ^ ^ No.      ^ Title                                                               ^ Resp   ^ MM ^ Nature ^ Diss ^ Due ^
-| D2.5.2.1 | Interfacing river runoff data to the ECOOP Data Management System   | met.no |  3 |  R      PP  |  18 |+| D2.5.2.1ECOOP River Station Lists (five regional) as digital spreadsheets   | met.no |  9 |  O      PP  |  12 | 
 +| <del>D2.5.3.1#</del> | <del>Interfacing river runoff data to the ECOOP Data Management System</del>   | <del>met.no</del> |  <del>3</del> |  <del>R</del>      <del>PP</del>  |  <del>18</del>
 +| D2.2.4.2## | Data interfaces for the ECOOP Data Management System   | CMRC |  ? |  R      PP  |  18 |
  
 +* This deliverable was misnumbered in the DoW. It really belongs to S2.5.1. However, it's easier to leave it with the wrong number. See [[s2.5.1]]
  
 +# This deliverable was misnumbered in the DoW. It really belongs to S2.5.2. However, it's easier to leave it with the wrong number. Summer 2008: The report has been merged into D2.2.4.2.
  
 +## There is an appendix in this report containing a description of the specific interfacing for river discharge data. 
  • ecoop-river/start/s2.5.2.txt
  • Last modified: 2022-05-31 09:29:32
  • (external edit)