Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
kvalobs:kvoss:system:qc2:8hdk376snf09zj37dk82s92:200911 [2009-11-09 21:54:06]
paule
kvalobs:kvoss:system:qc2:8hdk376snf09zj37dk82s92:200911 [2022-05-31 09:29:32] (current)
Line 5: Line 5:
 |02 |Administration (bi-monthly reporting and ECSN details). ECSN Slide preparation. SpaceCheck and more ECSN preparation. |10:00 |6 |20091102 1000-1600 | |02 |Administration (bi-monthly reporting and ECSN details). ECSN Slide preparation. SpaceCheck and more ECSN preparation. |10:00 |6 |20091102 1000-1600 |
 |03 |Travel to ECSN conference. |20:00 |4 |20091103 1400-1800 | |03 |Travel to ECSN conference. |20:00 |4 |20091103 1400-1800 |
-|04 |ECSN Data Management Workshop Copenhagen |- |7 hr 45 min |0800-1545 | +|04 |ECSN Data Management Workshop Copenhagen |- |7 hr 45 min |20091104 0800-1545 | 
-|05 |ECSN Data Management Workshop Copenhagen |- |7 hr 45 min |0800-1545 | +|05 |ECSN Data Management Workshop Copenhagen |- |7 hr 45 min |20091105 0800-1545 | 
-|06 |ECSN Data Management Workshop Copenhagen |- |7 hr 45 min |0800-1545 |+|06 |ECSN Data Management Workshop Copenhagen |- |7 hr 45 min |20091106 0800-1545 |
 |07 |- |- |- |- | |07 |- |- |- |- |
 |08 |- |- |- |- | |08 |- |- |- |- |
 |09 |ECSN follow up emails. Space Check work. |16:00 |4 |20091109 1600-2000 | |09 |ECSN follow up emails. Space Check work. |16:00 |4 |20091109 1600-2000 |
-|10 ||||- | +|10 |Space check algorithm work. |08:00 ||20091110 0800-1200 
-|11 |- |- ||- | +|11 |Trouble-shooting of cron jobs on dev-vm116 and test environment work. |16:00 |2 |20091111 1600-1800 
-|12 ||||- | +|12 |Attendance at an interoperability conference covering GEOSS, INSPIRE, etc ... |15:00 ||20091112 1500-1900 
-|13 ||||- |+|13 |Attendance at an interoperability conference covering GEOSS, INSPIRE, etc ... |15:00 ||20091113 1500-1900 |
 |14 |- |- |- |- | |14 |- |- |- |- |
 |15 |- |- |- |- | |15 |- |- |- |- |
-|16 ||||- | +|16 |Analysis of flags setting for ProcessUnit T algorithm. |06:00 ||20091116 1000-1300 
-|17 ||||- | +|17 |Teleconference and some documentation work. |16:00 ||20091117 1600-1900 
-|18 |- |||- | +|18 |Documentation of control flag settings. Check of dev-vm116 |12:00 ||20091118 1200-1500 
-|19 ||||- | +|19 |Administration for 2010. Preparation of test data.  |15:00 ||20091119 1500-1800 
-|20 ||- |- |- |+|20 |AVSPASERING |- |- |- |
 |21 |- |- |- |- | |21 |- |- |- |- |
 |22 |- |- |- |- | |22 |- |- |- |- |
-|23 ||||- | +|23 |Space check algorithms |12:00 ||20091123 1200-1800 
-|24 ||||- | +|24 |Analysis of Qc2 time interpolation flags and write up of notes and documentation. |12:00 ||20091124 1200-1600 
-|25 |- |||- | +|25 |Restarted and checked dev-vm116 after development 3 maintenance. Provided some support on interfacing C++ and FORTRAN to FOU. Research into INSPIRE.  |22:00 ||20091125 1700-2000 
-|26 |- |||- | +|26 |Followed up Qc2 flag discussion with kvalobs-drift. Administration. |12:00 ||20091126 1200-1500 
-|27 ||||- |+|27 |General algorithm work and testing (SpaceCheck, Time Interpolation). |20:00 ||20091127 0800-1300 |
 |28 |- |- |- |- | |28 |- |- |- |- |
 |29 |- |- |- |- | |29 |- |- |- |- |
-|30 ||- |- |- |+|30 |AVSPASERING |- |- |- |
  
  
  • kvalobs/kvoss/system/qc2/8hdk376snf09zj37dk82s92/200911.1257803646.txt.gz
  • Last modified: 2022-05-31 09:23:18
  • (external edit)