Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
kvalobs:kvoss:system:qc2:8hdk376snf09zj37dk82s92:200910 [2009-10-25 22:25:35]
paule
kvalobs:kvoss:system:qc2:8hdk376snf09zj37dk82s92:200910 [2022-05-31 09:29:32] (current)
Line 27: Line 27:
 |24 |- |- |- |- | |24 |- |- |- |- |
 |25 |- |- |- |- | |25 |- |- |- |- |
-|26 |- |||- | +|26 |Testing of time interpolation on dev-vm116. Generation of new test data. |16:00 ||20091026 1600-1800 
-|27 ||||- | +|27 |Teleconference. Update and configuration of doxgen documentation. Test of the new svn access control. Familiarisation with Qc2 system logging and inclusion of more notifications. |17:00 ||20091027 1600-2000 
-|28 ||||- | +|28 |ECSN slide preparation. Administration and various emails. |16:00 ||20091028 0800-1200 
-|29 ||||- | +|29 |ECSN preparation. |20:00 ||20091029 1200-1600 
-|30 ||||- | +|30 |Trouble shooting and checking of implemented algorithms. Confirmation of results for ECSN workshop. |16:00 ||20091030 0900-1400 
-|31 ||||- |+|31 |Analysis of the time variation of the performance of spatial interpolation methods. Preparation of figures for ECSN. Added time information to netcdf output. Fixed some algorithm bugs. |10:00 ||20091026 0800-1600 |
  
  • kvalobs/kvoss/system/qc2/8hdk376snf09zj37dk82s92/200910.1256509535.txt.gz
  • Last modified: 2022-05-31 09:23:18
  • (external edit)