ecoop-eurodess:s9.2.9_-_task_9.2_coordination

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revision Both sides next revision
ecoop-eurodess:s9.2.9_-_task_9.2_coordination [2009-10-12 11:11:00]
goranb created
ecoop-eurodess:s9.2.9_-_task_9.2_coordination [2009-10-12 11:34:06]
goranb
Line 1: Line 1:
 Task 9.2 coordination Task 9.2 coordination
  
-The final reports for the 9.2 subtasks should be delivered by end of November.  +The final reports for the 9.2 subtasks should be delivered by end of November. The formating for these reports are given in D.9.2.9.2 that can be downloadad from progecta or below
-Here is a description of the formatting, and + 
-here is an example document (i.e., the appendix to the formatting report).+{{:ecoop-eurodess:d9.2.9.2.doc| Here is a description of the formatting in word}} {{:ecoop-eurodess:d9.2.9.2.pdf|and as pdf}}, and 
 + 
 +{{:ecoop-eurodess:appendix_to_d9.2.9.2.doc| here is an example document in word}}  {{:ecoop-eurodess:appendix_to_d9.2.9.2.pdf|and as pdf}} (i.e., the appendix to the formatting report).
  • ecoop-eurodess/s9.2.9_-_task_9.2_coordination.txt
  • Last modified: 2022-05-31 09:29:32
  • (external edit)