Purpose of simulation: Historical run for expect model version
Contact person: Jerry Tjiputra jerry.tjiputra@uni.no
Data owner: Jerry Tjiputra jerry.tjiputra@uni.no
Revision Number: 249, https://svn.met.no/NorESM/noresm/branches/projectEXPECT_cmip5-r143-1
Production computer used: Cray XT3 in Bergen (hexagon)
Production date: Spring 2014
Ensemble runs: No
Storage locations: NorStore (/projects/NS2345K/noresm/cases/N20TRAERCNOCBPRP_EXPECT01 )
Storage space: ??
Projects: EXPECT
Publications:
Papers in preparation:
Simulation name(s): N20TRAERCNOCBPRP_EXPECT01
Compset name used: N20TRAERCNOCBPRP
Model type: Fully coupled
Type of run: Hybrid
Simulation period: 1850-2005
Initialisation Started as hybrid run from N1850BPRPCNOC_f19_g16_spin_02 with restart files from “0501-01-01”. This date maps to 1850-01-01 in this run.
Resolution: f19_g16= 1.9×2.5 degree atmosphere/land. Dipolar ocean/ice grid, ~ 1 degree
Emission year(s): 1850-2005
Greenhouse gases: Interactive CO2
Emission inventories N/A
Frequency for output: Monthly and selected daily
Active/changing forcing agents: Greenhouse gases: Direct and indirect (1. & 2.) effects of SO4, POM and BC.
Special considerations: Note that the number of cores used for historical runs was changed in revision 249. Earlier historical runs were too slow. A “bug” in was fixed. Do svn diff -r 249:246 to see the changes in noresm/scripts/ccsm_utils/Machines/config_pes.xml. Earlier version will not give bit identical results to this run even using same compset.
Tuning parameters which are changed relative to the host model NorESM-CMIP5-branch: