Dag Beskrivelse Tid Start Timer/hrs Tidbank Tid
01 Sprint 02 Meeting (1.5hrs). Clean-up of Qc2 separate branch autoconf. Bi-monthly administration tasks. 10:30 5 20100301 1030-1530
02 Regional interpolations. Teleconference kv2kl philosophy, virtual environment managment and teleconference experience enhancement. 16:30 4 20100301 1600-2000
03 Kvalobs database configuration. Test environement algorithm checks. 16:00 3 20100301 1600-1900
04 Update of kvDataFlag with Flag Group feedback. Testing and configuration of flagging. 12:00 5 20100301 1200-1700
05 Scrum. Environment variable work. Documentation and administration. 11:00 3 20100305 1100-1400
06 - - - -
07 - - - -
08 Input on re-organisation. General code tidy up and documentation. 14:00 3 20100308 1400-1700
09 Documentation work. Acceptance test file. 08:00 4 20100309 0800-1200
10 Tested flag checking controls. Updated the tests to see if the data has been tested by HQC or not. 17:00 3 20100310 1700-2000
11 Weekly scrum. Update kvoss distribution after puTools changes, sorted out pkg_config issues. 12:00 3 20100311 1200-1500
12 Added cfailed setting as a configuration file option. Checks and test to ensure Qc2 only runs after corresponding Qc1 runs (redistribution algorithm and temperature interpolation). 12:00 6 20100312 1200-1800
13 - - - -
14 - - - -
15 Identified and corrected bug in ProcessUnitT with -99.9 missing values in paramid 213 and 215. Exapnded the logic for handling flag tests. 18:00 6 20100315 1400-2000
16 Teleconference. Refined the handling of Best Station lists. 16:00 5 20100316 1600-2000
17 Investigated problems with database and test data. Performed test database maintenance. 17:00 3 20100317 1700-2000
18 Finalised and conducted dry-runs of ALG004. Updated documentation. 08:00 6 20100318 0800-1400
19 Finalised and conducted dry-runs of ALG001. Updated documentation. 16:00 4 20100316 1600-2000
20 - - - -
21 - - - -
22 Kvalobs Sprint Meeting. Qc2 general tidy-up and bug fixes.10:00 4 20100322 1000-1400
23 Re-organisation teleconference. Postgresql backup discussion and strategy with TER. Administration. 14:00 4 20100323 1400-1800
24 Qc2 Algorithm flag testing. Wrote and dry-run Qc2-FLG-E2E 18:00 4 20100324 1600-2000
25 Qc2 Scrum Meeting. Work on Qc2-OPE tests. 11:00 5 20100325 1100-1600
26 Improved Qc2 logging information. Dry-run acceptance tests and tweaked documentation.08:00 4 20100326 0800-1200
27 - - - -
28 - - - -
29 Completion of the acceptance test file. Updated distributions in the lone-branch and trunk, exported latest versions to the test machines. 16:00 6 20100329 0800-1400
30 Doxygen configuration and update. Documentation of configuration file parameters. 18:00 3 20100330 1700-2000
31 Work on Qc2 presentation and demo for April 7 meeting. 12:00 4 20100331 1200-1600