200909

Dag Beskrivelse Tid Start Timer/hrs Tidbank Tid
01 AVSPASERING - - -
02 Testing and configuration of upgraded pc2646 14:00 3 20090902 1400-1700
03 Qc2 Project Planning 08:00 4 20090903 0800-1200
04 Follow up activities to met.no visit and general administration. 22:00 2 20090904 1000-1200
05 - - - -
06 - - - -
07 Teleconference on test environement. Administration (hotel bookings) for ECSN. Continued building dev-vm116 test environment. 12:00 4 20090907 1200-1600
08 Administration and reporting. dev-vm116 test environment work and documentation. 08:00 3 20090908 0800-1100
09 dev-vm116 test environment work and documentation: installing kvalobs metadata 19:00 5 20090909 1200-1700
10 dev-vm116 test environment work and documentation: configuration of kvalobs daemons to run them on dev-vm116 18:00 3 20090910 0900-1200
11 Installed both Qc1 and Qc2 on dev-vm116, setup configuration so that all core kvalobs daemons run along with Qc2. Documented steps. 20:00 4 20090911 0800-1200
12 - - - -
13 - - - -
14 Fixed password configurations on kvalobs database and re-tested daemons. 09:00 3 20090914 0900-1200
15 Teleconference with Terje on setup of test environemnet and changes to stinfosys and digging into bugs. Documentation work. 17:00 2 20090915 1700-1900
16 AVSPASERING - - -
17 Investigating configuration of HQC to connnect to test environment. Homogeneity testing algorithm work. 07:00 3 20090917 0800-1100
18 Testing of dev-vm116 with Qc1 and Qc2 daemons. 15:00 3 20090918 1500-1800
19 - - - -
20 - - - -
21 Coordination of the set-up of the autoobs feed. Configure algorithms for endurance testing. 11:00 4 20090921 1100-1500
22 Teleconference. Work on duplicate filter methods.17:00 3 20090922 1700-2000
23 Temperature tests and interpolation methods. 08:00 3 20090923 0800-1100
24 Testing of single point interpolation techniques. Analysis and comparison of linear, TAN and TAX, model and neighbour methods. 08:00 4 20090924 0800-1200
25 Investigation of delaunay triangulation memory allocation problems manifest of virtual machine. Documentation work. 15:00 5 20090925 1500-2000
26 - - - -
27 - - - -
28 Debugging of triangulation routines. Problem with plotting output on dev-vm116 located. 18:00 6 20090928 1000-1600
29 Initiation of autoobs feeding mechanism to dev-vm116, trouble-shooting initial setup and cross-checks that no side-effects observed on operations. Teleconference. Adaptation of Qc2 scheduling to respond to live data. 14:00 5 20090929 1400-1900
30 Configuration file modifications. Memory leak issues for kvalobs Qc1. Test environment work. Administration. 12:00 5 20090930 1200-1700