200906

### Note For this month pre-registered Tidbank with Hjemmkontor since Tidbank schema now set to 50% full time. In an attempt to keep the met.no PC functioning as long as possible this minimises the need to boot the machine and connect to met.no internal servers.

01/07/2009: The total number of hours worked = 73,5. Days worked=21. Average hours per day = 73,5/21 = 3,5

In consequence, this month has been left as all hjemmkontor logged. The laptop was repaired by DELL service by the end of the month, hence hereafter will switch back to near real-time logging of time.

Dag Beskrivelse Tid Start Timer/hrs Tidbank Tid
01 - - - -
02 Administration 10:00 2 ###
03 Building kvalobs database on ubuntu machine, reported documentation update re pg_hba.conf. 18:00 5 ###
04 Set up of test data on ubuntu and documentation of build procedure. Completed ubuntu test environment with kvalobs user. 12:00 4 ###
05 Investigate changes in boost filesystem library. Update and test Qc2 code. 12:00 3 ###
06 - - - -
07 - - - -
08 Fixed boost file-system bug/regression. Trouble-shooted errors in kvalobs database and filled missing tables. 18:00 3 ###
09 Conducted test runs in ubuntu system. Identified best-station-file hardcoded bug. 12:00 3 ###
10 Teleconference and work on pg_hba configuration and kvalobs_metadata. Preparation of pc error report. 12:00 4 ###
11 Qc2 test database work. 15:00 3 ###
12 Qc2 algorithm work, methods for validating Qc1 checks. 12:00 4 ###
13 - - - -
14 - - - -
15 Rebuilt plotting routines in ubuntu. 18:00 3 ###
16 Research on implementation of Akima algorithms. 18:00 2 ###
17 Teleconference and documentation work. 17:00 3 ###
18 Development of R programs to generate documentation and test performance of interpolation algorithms. 12:00 4 ###
19 Added additional Qc2 routine to perform standard set of interpolations and provide results for comparative analysis. 12:00 4 ###
20 - - - -
21 - - - -
22 Miscellaneous Qc2 development. 12:00 3 ###
23 Preparation of ECSN abstract. Contact with DELL and trouble shoot laptop. 10:00 2 ###
24 Testing and documentation of algorithms. Teleconference on kvalobs db architecture. 15:00 3 ###
25 Investigated changes in proj and delaunay routines with respect to ubuntu 12:00 5 ###
26 Analysis and debugging of triangulation algorithm. Check installation of proj libraries on ubuntu. Tracing of segmentation faults with gdb. 12:00 6 ###
27 - - - -
28 - - - -
29 Documentation of different interpolation algorithms within the kvalobs wiki. Submitted abstract to ECSN. 16:00 4 ###
30 Repair of laptop with service engineer. Laptop testing. Monthly administration. 09:00 3.5 ###