Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
wisline:start [2015-03-30 14:29:14]
haroldmi
wisline:start [2022-05-31 09:29:32] (current)
Line 30: Line 30:
 available through data distribution systems operated by MET in order to support public and private available through data distribution systems operated by MET in order to support public and private
 sectors to adapt to climate change. MET Norway will through its core mandate, extend the results sectors to adapt to climate change. MET Norway will through its core mandate, extend the results
-demonstrated in the project into its base datasets for current and future climate in Norway. +demonstrated in the project into its base datasets for current and future climate in Norway.\\ 
 +\\ 
 +\\ 
 +**Partners:** \\ 
 +\\ 
 +The Norwegian Meteorological Institute [[http://www.met.no/|MET Norway]] \\ 
 +Kjeller Vindteknikk [[http://www.vindteknikk.no/|Kjeller Vindteknikk]] \\ 
 +The Department of Geosciences, University of Oslo [[http://www.mn.uio.no/geo/english/|Department of Geosciences]] \\ 
 +National Center for Atmospheric Research [[https://ncar.ucar.edu/|NCAR]]\\ 
 +Norwegian Institute of Bioeconomy Research [[http://www.nibio.no/en|NIBIO]] \\ 
 +Swedish University of Agricultural Sciences [[http://www.slu.se/en/|SLU]] 
 +\\ 
 +\\ 
 +**User group:** \\ 
 +\\ 
 +Statnett (system operator, the Norwegian energy system)\\ 
 +Skogbrand (insurance company owned by Norwegian forest owners)\\ 
 +Directorate for Emergency Communication (agency for public safety network) \\ 
 +Statskog (The Norwegian state-owned land and forest enterprise)\\ 
 +\\ 
 +The first user group meeting was 1 June 2015. The next will probably be autumn 2016, when we expect more datasets to be ready. An important purpose of the user group is to be pilot users of data and methods from WISLINE. Feedback from the user group will help us to produce results that are useful for society.\\  
 +\\
 **Important documents:** \\ **Important documents:** \\
 \\ \\
Line 37: Line 57:
 Project description: {{:wisline:wisline_proposalny.pdf|}}  \\ Project description: {{:wisline:wisline_proposalny.pdf|}}  \\
 Progress plan: {{:wisline:wislineprogressplanny.pdf|}} \\ Progress plan: {{:wisline:wislineprogressplanny.pdf|}} \\
-Notes from kickoff meeting: {{:wisline:referatwisline_11march15.pdf|}}+\\ 
 + 
 +**Meetings:** \\ 
 +\\ 
 +Notes from kickoff meeting: {{:wisline:referatwisline_11march15.pdf|}}\\ 
 +\\ 
 +Notes from meeting regarding cloud ice measurements: {{:wisline:WISLINE_MeetingCloudIceMeasure_280415.pdf|}} \\ 
 +Comment: We have found that it will not be possible to apply a disdrometer at Gaustatoppen becase of the extreme icing. We will instead install the it near Vemork, where Kjeller Vindteknikk plan to measure ice loads on a 300 kV and 420 kV power line as well as on a rotating cylindre. \\ 
 +\\ 
 +Project meeting 24 September 2015: {{:wisline:ReferatWP_moteWISLINE_24092015.pdf|}} \\ 
 +\\ 
 +Project meeting 1 February 2016: {{:wisline:MinutesMeetingWISLINE_01022016.pdf|}} \\ 
 + 
 +===== Presentations, posters, papers etc ===== 
 + 
 +**From IWAIS 2015:** \\ 
 +\\ 
 +Poster: {{:wisline:32_Pres_McInnes_V1.pdf|}} \\ 
 +Presentation: {{:wisline:32_Pres_McInnes_V2.pdf|}} \\ 
 +Paper: {{:wisline:32_Paper_McInnes_V1.pdf|}} \\
 \\ \\
 ====== WP1 ====== ====== WP1 ======
Line 45: Line 84:
 ====== WP2 ====== ====== WP2 ======
 **Establish high-resolution dataset for past, present and future weather and climate** \\ **Establish high-resolution dataset for past, present and future weather and climate** \\
 +
 +====== WP3 ======
 +**Climate change influence on the geographical distribution of wind and icing design loads in Norway** \\
 +
 +====== WP4 ======
 +**Forest damage from wind and snow** \\
 +
 +====== WP5 ======
 +**Data Services.** \\
 +
 +
  
  • wisline/start.1427725754.txt.gz
  • Last modified: 2022-05-31 09:23:36
  • (external edit)